Welcome“Dongguan Shuntaiyuan Trading Co., Ltd.”official website!

Dongguan Shuntaiyuan Trading Co., Ltd.

Durián Workflow ProcessDurian operation process

Your current location:HOME > Durian operation process

11、Load onto the vehicle, cool down and close the container

Publication date:2025-09-26  Number of views:7

Operation Method:
Loading
Standards: Correct weight, correct label, correct identification.
  1. Ensure that the packaging specifications in the same container are the same to facilitate the uniform refrigeration effect in the container.

  2. Control the container - closing time. Try to close one container within 2 days. The goods entering the container on the second day should have a slightly longer fermentation time than those entering on the first day, so as to unify the maturity of the two batches.

Cooling / Closing the Container
Temperature: 14℃, Return air: 16 - 16.7℃, Air outlet: 30%
To save transportation time, the vehicle can depart when the temperature inside the container reaches 20℃.



10-1.jpg

What do you think of this article?

0 0
标签:全部
上一篇:10、Package and ferment
下一篇:暂无数据
网友评论

管理员

该内容暂无评论

局域网网友